HRE December 2023 Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Heavy Rare Earths Limited (ASX:HRE)
25 January 2024
DECEMBER 2023 QUARTERLY ACTIVITIES REPORT
AND APPENDIX 5B
•
Material upgrade in rare earth Inferred Mineral Resources at Cowalinya (WA) to
159 million tonnes @ 870 ppm TREO, representing an increase of:
o
468% in resource tonnes
o
39% in grade
o
690% in contained rare earths
on the project’s maiden Inferred Mineral Resources
•
Sizeable Exploration Target estimated for Cowalinya: 280-1390 million tonnes @
330-1330 ppm TREO
•
Soil program defines extensive rare earth anomaly adjacent to historic rare earth
drill intersections at Duke (NT)
•
Perenjori (WA) rare earth project tenements granted
•
Cash balance as at 31 December was $1.3 million.
Heavy Rare Earths Limited (“HRE” or “the Company”) is pleased to announce its December
2023 quarterly activities report for the sixth quarter since listing on the Australian Securities
Exchange (ASX).
Cowalinya Rare Earth Project, Western Australia
The Company’s 100 per cent-owned Cowalinya project comprises three granted exploration
licences E63/1972, E63/2144 and E63/2145 approximately 110 kilometres north-north-east of
Esperance.
Mineral Resources Upgrade
During the quarter, the Company reported a very substantial growth in Inferred Mineral
Resources for Cowalinya to 159 million tonnes @ 870 ppm TREO using a 400 ppm TREOCeO2 grade cut-off (Table 1; refer to ASX announcement 3/10/2023). This result represents
material increases in resource tonnes (468%), grade (39%), and contained rare earths (690%)
on the project’s maiden Mineral Resources of 28 million tonnes @ 625 ppm TREO, reported
at the lower cut-off grade of 300 ppm TREO-CeO2.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
1
Table 1: Summary Estimate of Mineral Resources for Cowalinya Rare Earth Project.
JORC RESOURCE
CLASS
TONNES
(Mt)
TREO
(ppm)
MAGNET REOs
(ppm)
MAGNET
REOs/TREO
Sc2O3
(ppm)
Inferred
159
870
242
28%
32
TREO = La2O3+CeO2+Pr6O11+Nd2O3+Sm2O3+Eu2O3+Gd2O3+Tb4O7+Dy2O3+Ho2O3+Er2O3+Tm2O3+Yb2O3+Lu2O3+Y2O3
Magnet REOs = Pr6O11+Nd2O3+Tb4O7+Dy2O3
Reported above a cut-off grade of 400 ppm TREO-CeO2
Following the upgrade, Mineral Resources now occupy 11% of HRE’s total land position of
252 km2 (Figure 1). The average total thickness of the three interpreted mineralised layers
(upper SUM, middle SMM and lower SLM) in weathered saprolite that comprise the Mineral
Resources is nearly 15 metres and the top of the predominant mineralisation lies about 15
metres below surface. The Competent Person (Mineral Resources) considers the shallow,
weathered and near horizontal nature of the mineralisation may allow broad-scale free-dig
mining and excavation with equipment such as scrapers and continuous miners.
Significantly, the valuable magnet rare earth component (Pr, Nd, Tb, Dy) of the Mineral
Resources has also increased from 25% to 28% which is considered best in class amongst
Australian clay-hosted resources. Individual rare earth concentrations for each of the three
mineralised layers and for the total Mineral Resources are detailed in Table 2.
Figure 1: Cowalinya Mineral Resources and Exploration Target.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
2
Table 2: Estimate of Mineral Resources for Cowalinya Rare Earth Project showing individual REOs and potentially deleterious elements.
Cowalinya Rare Earth Oxide (REO) Mineral Resources
REOs in weathered saprolitic regolith. Cut-off on (TREO - CeO2) value. Block compute distance <450 m.
Layer
JORC
Cut-off0
Resource TREO1-CeO2
(domain)
class
SUM (2) Inferred
SMM (3) Inferred
SLM (4) Inferred
All
Inferred
Total REO
TREO1
Total
Individual "Light" REOs
La2O3
CeO2
Pr6O11
Individual "Heavy" REOs
Nd2O3
Sm2O3
Eu2O3
Gd2O3
Tb4O7
Dy2O3
Ho2O3
Er2O3
Tm2O3
Yb2O3
Lu2O3
Y2O3
Potentially
deleterious5
Assoc.
Th
Sc2O2
U
REO
(ppm)
(ppm)
(ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
400.0
1,060.4 211.0 374.6
59.8 242.9
41.8
9.3
25.3
3.1
12.9
2.2
5.3
0.8
4.5
0.7
66.3
14.5
4.4
21
400.0
860.9 158.9 236.9
45.2 172.6
33.8
7.1
28.5
4.0
21.6
4.2
11.1
1.6
9.8
1.4 124.3
18.9
5.9
30
400.0
863.9 136.6 231.7
41.8 165.6
34.0
7.5
31.0
4.5
24.6
4.9
13.4
1.9
11.7
1.7 153.1
13.8
5.4
33
400.0
870.3 145.8 238.5
43.4 170.5
34.2
7.5
30.1
4.3
23.3
4.6
12.4
1.8
10.9
1.6 141.6
15.3
5.5
32
Proportion of TREO: 16.7% 27.4%
5.0% 19.6%
3.9%
0.9%
3.5%
0.5%
2.7%
0.5%
1.4%
0.2%
1.2%
0.2% 16.3%
0
Total REO minus Cerium oxide = TREO1 - CeO2. Combination commonly used grade cut-off in clay-hosted REE deposits.
Total REO (TREO) = REOs + Yttrium oxide = ((La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Er2O3 + Tm 2O3 + Yb2O3 + Lu2O3) + Y2O3)
5
Th and U are typically associated with rare earth deposits and may be deleterious in processing due to their radioactivity.
1
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
3
Maiden Exploration Target
During the quarter, the Company also reported a sizeable Exploration Target of 280-1390 million
tonnes @ 330-1330 ppm TREO for the Cowalinya project (Table 3; refer to ASX announcement
23/10/2023). The potential quantity and grade of the Exploration Target is conceptual in nature,
and there has been insufficient exploration completed by HRE on parts of its Cowalinya tenement
package to estimate Mineral Resources. Furthermore, it is uncertain if further exploration will
result in defining additional Mineral Resources at Cowalinya.
Table 3: Exploration Target for Cowalinya Rare Earth Project.
JORC CLASS
TONNES
(Mt)
TREO
(ppm)
AVERAGE
TREO (ppm)
AVERAGE
MAGNET
REOs (ppm)
AVERAGE
MAGNET
REOs/TREO
Exploration
Target
280-1390
330-1330
570
150
26%
TREO = La2O3+CeO2+Pr6O11+Nd2O3+Sm2O3+Eu2O3+Gd2O3+Tb4O7+Dy2O3+Ho2O3+Er2O3+Tm2O3+Yb2O3+Lu2O3+Y2O3
Magnet REOs = Pr6O11+Nd2O3+Tb4O7+Dy2O3
Figure 1 shows the area of Mineral Resources (red) in the densely-drilled south-east corner of
E63/1972. Exploration Target areas, which occupy 34% of HRE’s total land position at Cowalinya,
are located 1) in the immediately adjacent less densely drilled areas (blue) within the Resource
Area (dashed blue border), and 2) further to the north-west within the four pink hatched areas
containing single lines of reconnaissance aircore drill holes (black dots). Rare earth-mineralised
intercepts in all holes along the lines clearly demonstrate continuity of the mineralised layers
found to the south-east in the Resource Area.
The Competent Person (Mineral Resources) considers the Cowalinya Exploration Target to be a
highly realistic, and conservative, estimate of the rare earth exploration potential of at least the
whole central part of E63/1972, at least the whole of E63/2144 and in all likelihood E63/2145.
Metallurgical Program
HRE has commissioned Perth-based Strategic Metallurgy to design and undertake a
comprehensive metallurgical program for the Cowalinya project. During the quarter, substantial
progress was made on two key work streams that commenced in Q3 2023. The Company expects
to report final results during Q1/Q2 2024.
1. A broad program of diagnostic leaching under optimised leach conditions on 63 (4- to 6metre) mineralised composites from across the project’s Mineral Resources and
Exploration Target. The locations of the composites are shown in Figure 2 as yellow
crosses, adding to the original 13 (4- and 5-metre) composites (green crosses) which
delivered encouraging size-by-assay and leaching results (refer to ASX announcements
13/12/2022 and 12/7/2023). These composites have been identified by HRE using
geochemical algorithms aimed at discriminating preferred material (i.e., both high magnet
rare earth extraction and low hydrochloric acid consumption) from non-preferred material
(i.e., either low magnet rare earth extraction or high hydrochloric acid consumption). This
work will provide further insight into the geo-metallurgical variability of mineralisation at
Cowalinya and test the robustness of HRE’s material type discrimination algorithms.
2. A bench-scale program to develop a flowsheet to a mixed rare earth carbonate (“MREC”)
product which represents the first entry point by clay-hosted projects into the rare earth
supply chain. Subject to the success of this program, the Company plans on making
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
4
MREC samples available to refiners in Europe, Asia, the United States and Australia to
determine marketability.
Figure 2: Location of Cowalinya metallurgical composites.
Duke Rare Earth Project, Northern Territory
The Company’s 100 per cent-owned Duke project comprises two granted exploration licences
EL33101 and EL33194 approximately 50 kilometres north-west of Tennant Creek. The
exploration model being investigated by HRE at Duke is a Browns Range-style unconformityrelated hydrothermal system, where rare earths are expected to be hosted in xenotime, a yttrium
phosphate mineral that contains high concentrations of heavy rare earths (“HREE”). A secondary
target for exploration at Duke is HREE-enriched ion-adsorption clay-type mineralisation hosted
in saprolite developed on the extensive but poorly outcropping Warrego Granite.
During the quarter, HRE received assays from a 450-sample soil survey covering prominent
thorium (Th) and uranium (U) airborne radiometric anomalies from past explorers, and from two
historic percussion drill holes that sampled saprolite over the Warrego Granite in the northern
part and north of the soil survey (refer to ASX announcement 13/11/2023). The soil survey
identified a 7 km2 zone of rare earth enrichment in the northeastern part of the area (Figure 3)
and was also successful at extending a copper-bismuth-gold soil anomaly identified, but never
drilled, by a previous explorer. Drill hole assays returned substantial thicknesses of rare earth
mineralisation that, whilst contiguous with, do not coincide with the best rare earth soil anomalies:
•
•
42 metres @ 770 ppm TREO from 8 metres in hole 79SRRD-021
24 metres @ 805 ppm TREO from 4 metres in hole 79SRRD-010.
Sampling of historic core hole TCPD11 which intersected Warrego Granite also returned elevated
rare earth grades averaging 839 ppm TREO over 82.2 metres.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
5
Figure 3: Image of rare earths in clay fraction of soils.
Assays of historic percussion drilling of saprolitic Warrego Granite also shown.
Merino and Perenjori Rare Earth Projects, Western Australia
The Company’s 100 per cent-owned Merino and Perenjori projects are located within 225
kilometres of the port city of Geraldton. Together they comprise five exploration licences:
E59/2795, E59/2796 and E59/2844 (Merino), and E70/6397 and E70/6398 (Perenjori). Both
project areas were highlighted in an internal study targeting ionic adsorption-type rare earth
deposits in palaeochannels on Archaean granitic basement. Both areas have received minimal
exploration attention and neither area has previously been explored for rare earths.
During the quarter, the southernmost tenement at Perenjori E70/6398 was granted to HRE by the
Department of Mines, Industry Regulation and Safety (refer to ASX announcement 21/11/2023).
E59/2844 is the sole remaining tenement awaiting grant.
A reconnaissance visit by HRE to Merino and Perenjori during the quarter encountered excellent
physical access featuring flat, open landscape and sparse basement outcrop (Figure 4). Low to
moderate levels of rare earth anomalism were returned in assays from 14 grab samples of granite
and meta-sedimentary/meta-igneous rocks from across the project areas. At Merino, re-assay of
paleochannel fill from historic air core drill holes YAC001, 002 and 004 (refer to ASX
announcement 1/9/2023) returned the following results:
•
•
•
YAC001: 10 metres @ 762 ppm TREO from 84 metres
YAC002: 27 metres @ 627 ppm TREO from 20 metres
YAC004: 4 metres @ 380 ppm TREO from 32 metres.
These holes intersected granite at 92 metres, 40 metres (weathered) and 70 metres, respectively.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
6
Figure 4: Typical Merino (L) and Perenjori (R) landscape.
Research and Development Tax Incentive Claim
During the quarter, the Company submitted a claim to the Department of Industry, Science,
Energy and Resources (AusIndustry) under the Australian Government’s Research and
Development (R&D) Tax Incentive program. The claim covers eligible R&D activities undertaken
by HRE on the Cowalinya rare earth project during FY2024. The value of the refundable tax offset
is estimated to be $312,168.
Additional Information
The table below compares the Company’s actual expenditure against the 2-year Use of Funds
table contained in the Company’s IPO Prospectus dated 5 July 2022:
Use of funds as contained in the Prospectus
2-Year Use of Funds
as contained in the
Prospectus
Actual amount
spent to date
Drilling – exploration & resource upgrade
$2,340,000
$1,817,178
Assaying
$440,000
$328,574
Metallurgical process development
$325,000
$47,648
Project Studies
$400,000
$73,683
Duke project exploration
$100,000
$146,007
Merino project exploration
-
$29,524
Perenjori project exploration
-
$17,989
Payment for Cowalinya vendors – exercise of option
$300,000
$300,000
Costs of the Offers
$640,000
$649,000
Administration & working capital
$1,455,000
$1,349,910
Total
$6,000,000
$4,759,513
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
7
Since listing on ASX in August 2023, the Company has spent a significant amount on executing
its exploration strategy to increase shareholder wealth. The amount spent to date has been
dominated by drilling and assay resulting in a material increase in the Company’s Inferred
Resources at Cowalinya. Over the coming months, exploration expenditure is not anticipated to
be as high as previous quarters as the Company advances its key metallurgical programs for
Cowalinya.
Appendix 5B related party payments
Amounts included in section 6.1 of the Appendix 5B relate to Director’s fees paid for the
December 2023 quarter.
Interests in Mining Tenements
Below is a summary of the mining tenements held by the Company at the end of the quarter:
Mining Tenement
Location
E63/1972 – Cowalinya Project
E63/2144 – Cowalinya Project
E63/2145 – Cowalinya Project
EL33101 – Duke Project
EL33194 – Duke Project
E70/6397 – Perenjori Project
E70/6398 – Perenjori Project
E59/2795 – Merino Project
E59/2796 – Merino Project
E59/2844 – Merino Project
* Subject to grant.
WA, Australia
WA, Australia
WA, Australia
NT, Australia
NT, Australia
WA, Australia
WA, Australia
WA, Australia
WA, Australia
WA, Australia
Beneficial
Percentage held
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%*
Interest
acquired/farm-in or
disposed/farm-out
during the quarter
100%
100%
-
-- Ends -This announcement has been approved by the Board of HRE.
For more information, please contact:
Executive Director
Richard Brescianini
info@hreltd.com.au
Media Enquiries
Ryan Batros
ryan@brcapital.com.au
About Heavy Rare Earths Limited
Heavy Rare Earths Limited (ASX:HRE) is an Australian rare earth exploration and development
company. HRE’s key exploration project is Cowalinya, near Esperance in Western Australia. This
is a clay-hosted rare earth project with a JORC Inferred Resource of 159 Mt @ 870 ppm TREO
and a desirable rare earth composition where 28% are the valuable magnet rare earths and 23%
the strategic heavy rare earths.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
8
Competent Persons Statement
The Exploration Results contained in this announcement were compiled by Mr. Richard
Brescianini. Mr. Brescianini is a Member of the Australian Institute of Geoscientists (MAIG). He
is a director and full-time employee of Heavy Rare Earths Limited. Mr. Brescianini has more than
35 years’ experience in mineral exploration and has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration to qualify as a Competent Person as
defined in the 2012 JORC Code.
The Mineral Resources and Exploration Target contained in this announcement were compiled
by Mr. Robin Rankin. Mr Rankin is a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM) and accredited as a Chartered Professional by the AusIMM in the Geology discipline.
He is the Principal Consulting Geologist and operator of independent geological consultancy
GeoRes. Mr Rankin has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration to qualify as a Competent Person as defined in the 2012
JORC Code.
Heavy Rare Earths Limited (ASX:HRE)
ACN 648 991 039
Level 21, 459 Collins Street, Melbourne, VIC 3000
www.hreltd.com.au
9
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
HEAVY RARE EARTHS LIMITED
ABN
Quarter ended (“current quarter”)
35 648 991 039
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(6 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(23)
(70)
(e) administration and corporate costs
(181)
(360)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
9
21
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(195)
(409)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(225)
(409)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(6 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(225)
(409)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,723
2,121
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(195)
(409)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(225)
(409)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
1,303
1,303
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,303
1,723
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,303
1,723
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
40
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(195)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(225)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(420)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,303
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,303
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.10
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
25 January 2024
Authorised by: The Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.